PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started installing the sanitary piping at the 1st Floor Facing East (800x600).jpg Started laying out block at the Juvenille-Adult Cells Facing South-East (800x600).jpg Started pathching Stair -4 (4th Floor) (800x600).jpg Unloaded duct work at the 2nd Floor Facing East (800x600).jpg Welding clips at the 4th Floor East Elevation(800x600).jpg
Previous page Welding clips at the 4th Floor East Elevation(800x600)
Welding clips at the 4th Floor East Elevation(800x600)